The White House

Installed in 2002, the system includes 145 roof-mounted solar panels, 3 grid-tied inverters and utility interconnection.For this project, Aurora performed:

  • Feasibility Study –Site Analysis
  • Site Selection
  • Comprehensive Design, Documentation, Construction
  • Installation
  • Commissioning and System Performance Validation

In 1979, President Carter had predicted the then-installed solar water heater on the White House grounds will “either be a curiosity, a museum piece, an example of a road not taken, or it can be just a small part of one of the greatest and most exciting adventures ever undertaken by the American people.”

We agree.

The White House Washington DC

NSA

This 198.81 kW roof-top design installed in 2014 provides the facility with an estimated 326,858 kWh annual generation.  Through the life of the system, a projected 8 GW of power will be produced.

Energy savings. Energy security.

National Security Agency Fort Meade MD

The Maryland Science Center

The system included the installation of 18 wall mounted solar modules, 56 roof mounted modules, 2 grid-tied inverters and web accessible monitoring.  For this special project, Aurora performed:

  • Site Selection
  • Comprehensive Design, Documentation, Construction
  • Installation
  • Commissioning and System Performance Validation
  • Grant and Incentives Documentation
  • Monitoring

The system’s purpose was to show center visitors how solar production works.  The monitoring data is available in the electricity displays. 

       

  

Maryland Science Center Baltimore MD

Department of State 

The system included the installation of 104 roof mounted solar modules, a grid-tied central inverter and utility interconnection.  Aurora’s energy solution services included  

  • Site Analysis
  • Load Calculations
  • Life Cycle Cost Analysis
  • Site Selection
  • Comprehensive Design, Documentation, Construction
  • Installation
  • Commissioning and System Performace Validation
  • Monitoring

Aurora Energy continues to support a semi-annual service and maintenance contract for the system.  Findings during the visit are complied into a report that is reviewed by EMCOR Government Services, manager of O&M services for the building.

Department of State Washington DC

Earth & Space Science Laboratory 

The system included the installation of 50 roof mounted solar modules, 24 wall mounted solar modules, 2 grid-tied inverters, a remote monitoring system, a weather station and utility interconnection.

The monitoring system is publicly available via the internet and displayed in the lobby for educational purposes. The weather station monitors cell temperatures, ambient temperatures, irradiance and wind speeds.

       

  

Earth & Space Science Laboratory Frederick MD

The Pentagon

As part of an aggressive Clinton-era initiative to install solar on 1 million buildings throughout the country in the 1990s, the Department of Defense led by example when they commissioned Aurora Energy to design & install a 110 kW solar array to offset a percentage of the Pentagon’s campus. In the process, Aurora performed:

  • Site Analysis
  • Engineering
  • System  Design
  • Installation
  • Commissioning

 

Arlington Central Library

In this turnkey energy solution, Aurora provided:

  • Site Analysis
  • Engineering
  • Design
  • Installation

The system includes the installation of 250 roof mounted solar modules across three separate roof surfaces, 5 grid-tied inverters, remote monitoring system and utility interconnection.  

The monitoring system is publicly available via the internet and displayed in the Library lobby for educational purposes.

Arlington Central Library Arlington VA

Walker Conservancy

The system, located in Roanoke Virginia, includes 36 roof mounted solar modules, 2 grid-tied inverters, a remote monitoring system and utility interconnection.
The monitoring system provides real time system information via the internet and wall mounted display.  Aurora performed a full-site service including:

  • Feasibilty Study –Site Analysis
  • Load Calculations
  • Life Cycle Cost Analysis
  • Site Selection
  • Comprehensive Design, Documentation, Construction
  • Installation
  • Commissioning and System Performace Validation
  • Grant and Incentives Documentation
  • Monitoring
Walker Conservancy Roanoke VA

U.S. General Services Administration

The GSA Suitland project is a 100 kW grid-tied solar electric system. Aurora Energy provided turnkey energy solutions including:

  • Feasibilty Study –Site Analysis
  • Load Calculations
  • Life Cycle Cost Analysis
  • Site Selection
  • Comprehensive Design, Documentation, Construction
  • Installation
  • Commissioning and System Performace Validation

The system included the installation of over 1000 ground mounted solar panels,  central grid-tied inverters, isolation transformer and utility interconnection.

Suitland Federal Center Suitland MD